Hi all,

The one dish system is a no go now as I mentioned before as it is too costly!

But the apartment blocks have void roof space in them allocated for dishes so you will not see them!
Villas and bungalows are having them installed on the sides of the properties rather than on the roof -also the dishes are only 60cm instead of the 1.5 metre dishes we was lead to believe that may have been needed!

The maintenance company is to be run by swb for 6 months after completion and then it is up to the RA to decide and organise who will run the site thereafter!!

Thats why setting up a RA is vital as otherwise after the 6 month period we may well be left on our own ?? To look after the site etc??

Construction on the site does seem to be happening very fast and deadlines will always be missed -whereever you are or whatever your doing especially in the construction industry Im afraid!!

The backup generator on site is for communal facilities only and not for the individual units as the system they have installed cannot cope with the backup for the whole complex!!

Take care all-D